Summer Renovation Work Begins
(Both walkways in front of the two school buildings
are being replaced this summer)
![]() |
Main School Entrance Is Off Limits |
![]() |
All entrances and walkways in front
of both schools are closed for the summer |
![]() |
Tables and Bees Have Been Relocated
for the Summer |
![]() |
Landscaping Will Be Redone After Walkways
Are Repaired |
| What's New? | | | HTS Home Page |